0086-371-8709 1886

concrete.sales@zzbona.com

Room 605.Unit 1.Building 4. No.39 Huayuan Road, Jinshui District, Zhengzhou City, Henan Province.

How to control dust pollution in the concrete mixing plant?

2014-08-07

  The hopper should be elevated to the top dead center for maintenance and overhaul.Before each formal operation Mini concrete mixer, should enhance the bucket manually lifting and landing, in order to determine whether the limit switch flexible and reliable. The second limit switch should be checked once a day is flexible and reliable, checked weekly limit limit switch reliability.

  Wear liner wear and pressure plate bolts should be checked monthly, based on the use of the mixing station. And replace damaged liner and bolt. The first week of the mixing station concrete bathing plant, should be checked daily for all the sensors on the set silo bearing nut locking, later changed to a weekly check.
  Capabilities of concrete mixer is determined by several parameters, only one parameter can not be fully describe its function. Shaft power, blade discharge quantity, blade diameter, pressure head, blending speed are five basic parameter to describe a mixer.

ZHENGZHOU BONA ENTERPRISE CO.,LTD.

Tel: 0086-371-8709-1886   E-mail: concrete.sales@zzbona.com

Concrete mixer Concrete batch plant Concrete mix plant Site Index | Product Index