Forced mixer is a widely used concrete mixing equipment, in fact, its feeding volume and mixing time are carefully designed by our manufacturers.
In order to ensure that all parts of the material in the forced mixer can be fully mixed, we design the forced mixer mixing cylinder will look very large, the actual mixing capacity does not occupy all of the geometric volume. Why we do not recommend entering more materials at one time? Because we need space for our mixing work, if too much material is fed, it is not conducive to the full mixing between the various parts of the material. So sometimes customers buy back the forced mixer, do not look at the mixing cylinder so large, it is reckless to increase the material into it, once increased too much, it is easy to lead to mixing quality reduced, please customers strictly control the mixing volume.
Second is the mixing time of the forced mixer, we all know that from the raw materials into the mixing cylinder, until the discharge, which the mixing cycle for the forced mixer mixing time. We generally call the minimum time that can meet the engineering performance of concrete as the minimum mixing time. This time, customers know better than our manufacturer, different formulas, different mixers, and only through mixing experiments, can we reach a reliable conclusion. However, when the concrete is mixed inside the forced mixer for a certain amount of time, mixing again does not directly affect the concrete strength, and at this time, extending the time will only reduce the production efficiency.
Each model of forced mixer we produce is equipped with a corresponding manual, which indicates the feeding capacity and mixing time of the forced mixer, as well as a nameplate on the machine.