0086-371-8709 1886

concrete.sales@zzbona.com

Room 605.Unit 1.Building 4. No.39 Huayuan Road, Jinshui District, Zhengzhou City, Henan Province.

Maintenance of concrete pump

2014-07-03

 To guarantee the normal condition of concrete pump, you should have a regular maintenance of it and used concrete mixer,followingparts are the maintenance methods:

concrete pump routine maintenance
(1)Check threaded connection, to ensure a firm connection.
(2)Filled with grease, water plus 2 / 3 water and 1 /3 of the oil or hydraulic oil.
(3)Check the lubrication system work, you should see the progressive distributor indicator rod back and forth action, S tube arm position end bearings, stirring shaft bearings lubricating oil and other lubrication points position overflow. Manual lubrication points each class should inject grease.
(5)Inspect the valve commutation, reversing the normal operation of the mixing device.
(6)Check the hydraulic system if there is leakage, oil leakage.
Bsides, there is a question that you have to consider: repair and maintenance of the quality and work of a great relationship, if too much dust, the filter should be bold. So cleaning cycle can not be generalized.
 

ZHENGZHOU BONA ENTERPRISE CO.,LTD.

Tel: 0086-371-8709-1886   E-mail: concrete.sales@zzbona.com

Concrete mixer Concrete batch plant Concrete mix plant Site Index | Product Index