Some special demands of concrete batching plant

2014-07-03

 When installing concrete batching plant, there are always some special demands, the demands are various, in the following parts, we give you the detailed description:

1 .HZS120 mixer station, hosts a capacity of 1.5 m, 9 m should be concrete mixing truck is equipped to install four material. Transport distance of about 12KM, within six hours to complete watering concrete beam 320 m, with 10 to 11 should be concrete mixer truck.
 
2. HZS90 + HZS120 concrete batching plants, should be equipped with 8 m concrete mixer truck to install four material. Transport distance 12KM, within six hours to complete watering concrete beam 320 m, with 13 to 14 units should be concrete mixer truck.
 
3.Concrete mixing station for each completed a concrete delivery vehicle: HZS120concrete batching plants require 1.25 hours, HZS90concrete batching plants require 1.32 hours.sidewalk travel speed: 24 km / h to 24 km round-trip transportation distance is calculated as an example.
4.Concrete mixer truck loading time: HZS120 Machine 1/ 6 hours / car, HZS90 machine 7 /30 / hour.
5.Concrete mixer truck unloading time: 5 minutes.
 